BidSphere Consulting (Pty) Ltd
Professional Engineering Services: Bulk Water Reticulation Upgrade, Region D
Tender reference COJ/RFB-2419/2026 · City of Johannesburg Metropolitan Municipality
- Closing date
- 02 Oct 2026
- Bid owner
- Nomsa Dlamini
- Province
- Gauteng
- Contract period
- 36 months
Certified true copy
Certified a true copy of the original document.
Fatima Patel
Commissioner of Oaths / Bid Compliance Officer
BidSphere Consulting (Pty) Ltd · Reg. 2014/118293/07
Johannesburg, Gauteng · 19 Aug 2026
1. Executive summary
Clause 7.2 (p. 21) · Prepared by Lerato Mahlangu · Reviewed by Nomsa Dlamini · Status In Review
BidSphere Consulting submits this proposal for the Region D bulk water reticulation upgrade. We bring a registered professional team, a calibrated modelling capability and a proven record on comparable metropolitan networks.
Certified true copy
Certified a true copy of the original document.
Fatima Patel
Commissioner of Oaths / Bid Compliance Officer
BidSphere Consulting (Pty) Ltd · Reg. 2014/118293/07
Johannesburg, Gauteng · 19 Aug 2026
2. Detailed methodology
Clause 6.3.2 (p. 19) · Prepared by Sipho Khumalo · Reviewed by Thabo Mokoena · Status Drafting
Our approach to the Region D bulk water reticulation upgrade is structured around four phases: condition assessment, hydraulic modelling, detailed design, and construction monitoring.
Phase 1 — Condition assessment. We establish a verified asset baseline by combining the municipality's existing GIS data with targeted field verification at 42 nodes, CCTV inspection of critical sections, and pressure logging over a 14-day period to capture diurnal demand.
Phase 2 — Hydraulic modelling. We build a calibrated model with calibration targets within 2 m head at all logger points under peak-hour conditions, allowing upgrade options to be tested against realistic demand growth.
Phase 3 — Detailed design. Designs are issued in three packages so that early works can proceed while later packages are finalised, with a formal design review at each package gate.
Phase 4 — Construction monitoring. A resident engineer supported by the design team monitors quality, programme and payment certification through to practical completion.
Certified true copy
Certified a true copy of the original document.
Fatima Patel
Commissioner of Oaths / Bid Compliance Officer
BidSphere Consulting (Pty) Ltd · Reg. 2014/118293/07
Johannesburg, Gauteng · 19 Aug 2026